Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts
06/03/2010
13/12/2009
12/12/2009
City Symbiosis
Michael Rakowitz is not an architect, but he has probably made more houses than many architects in the last ten years. Architects should be envious of the artist's production and vision. He is working with the margins of society. His project Parasite uses a building's heat exhaust to inflate plastic sheeting, creating dwellings for the homeless. For Rakowitz the project is about community involvement as well as dwelling design. He is responsive to the needs of his "clients."
Courtesy Michael Rakowitz
Bill S.’s paraSITE shelter. He requested as many windows as possible, because “homeless people don’t have privacy issues, but they do have security issues. We want to see potential attackers, we want to be visible to the public.” Six windows are placed at eye level for when Bill is seated and six smaller windows for when Bill is reclining.
The article on these structure at World Changing highlights the social impact of his projects. The social agenda is remincient of Archigram, Archizoom and the social idealist and critics of the sixties,where the concept of building was challanged to mean utopian spaces, inflatable huts, or technological phenomena in the guise of a natural environment.
Copyright David Green - Courtesy Archigram
Projects like the living pod,above, imagines a green field condition where the building tapped into site resources to make its own place. Parasite deals with the roughness and tactics of city dwelling. These structures are deployable in the aims of allowing their inhabitants to move when they are at the limits of the law.
At The Functionality we want to encourage this type of tactical thinking. Architects, artists, urban designers, even graphic designers need to re-examine how we will approach the city, our suburbs and even our housing as the economic and environmental conditions unfold. We think the sooner we start the better off we will be.
Labels:
3d,
architecture,
biology,
communication,
construction,
design,
model,
presentation,
structure,
theory
ARS Report
Hello, Cesar reporting from ARS electonica Linz, Austria, Friday 24 July 2009.
Over the last 15 days, tensions and misunderstandings kept on increasing in the organisation of what would happen at the ARS Electronica festival. This is why I went to ARS to sort this, and I think it has been a succesful journey. Yesterday we found an agreement that would make everyone happy I hope :
- making a good show.
- making the continuation of the research possible.
What's is:
== They like the Open_sailing project a lot ==
They insist they like the Open_Sailing a lot, and they put a lot of effort in making it happen.
They will make sure we meet interesting people and they ask us to focus on the quality of the presentation. So, they want to make clear it is more a presentation of a project than a project itself...
== The contract ==
The contract has been signed by both ARS directors and us. Which means, now we are legally bound, finally. Another piece of the contract is missing, the one in which we agree of the detail of what's being made, the final design being the decision of ARS. I guess this more technical piece of contract will be signed once we agree on the final design, I propose one at the bottom of this message.
== The money ==
The total [Next IDEA] allocated budget of €15000 is divided in 2 parts :
a. € 7500 life : transport, hotel, food for us when we come to the festival to produce the work, and we can use this budget the way we like, it is ours.
b. € 7500 production : that means the fabrication of our exhibited artwork, materials, labour, including the ARS staff labour (32.5€/ hour/ staff), this money remains under the control of ARS, in other words, if we want to pay something for production, we must ask ARS, and ARS pays for it, indirectly...
Yesterday, thursday 23 July 2009, the first instalment (a. budget) of €4000 transfert was sent, should be reachable next tuesday. The next and final a. instalment of €3500 will be paid after the exhibition.
== Boat and Permission on the Danube ==
We won the [NEXT IDEA] grant with this proposal :

You can download the pdf of our application here.
Unfortunately ARS couldn't get the permssion for us to put in the water, moor, and navigate, even with our detailled specifications and intentions. The Danube is very regulated river, fast and strong, with a lot of traffic, and regulations and norms. ARS also refuses to show the Open_Sailing on land. In other words, there is no way we can bring and present the Open_Sailing real vessel, the container will not come to Linz, we wont depart on the Danube the 9th of september for a wonderful adventure to the Black Sea...
I was very sad and disapointed when I understood this. Since we won the grant with the above proposal, since more than 2 monhts all our efforts has been directed to make this picture a reality, so much money was spend, many of us travelled from another country to come to work in London in difficult conditions, some of us even quit their well-paid full-time job, I personnaly invested all my life savings and even borrowed money from my family I must return urgently, Ben and Troyo did the same cominbg from Berlin, Nasser litteraly abandonned his life in Paris, house, family, work, savings, just to give a few examples...
== Alternatives ==
This does not mean the project is over. NO WAY ! The project is about the research, not about the show, so let's carry on !
I personally never to exhibit for the sake of it, I want to exhibit to show new researches, I dont want to exhibit twice the same thing, I want to explore, not parade.
Of course, on the other hand we need to give the project notoriety to gain credibility to attract investment to carry on the research.
What do we have now ?
- a team of super motivated people, who have skills and curiosity to carry our new experiments
- we have designed and build the boat beyond 50%
- we have some budget
- we have plenty of things we want to test, and perhaps much more time since the
So, what shall we do now ?
- prepare a good show in Linz to attract a more international support, for a long term development.
- continue the research. Now some researches like the nomadic ecosystem needs "growing" on the water to be usefull.
Where shall we carry on the construction?

London
We can carry on building in Area 10 for a few more days, but now they are waiting for us to get out, our vessel is too fragile to go on North sea storm, but good enough for a small closed sea, a lake, easily. So let's take it to where we can show it, and in London, short term we don't have a date yet.
Berlin
We could work at the Atelier KW (at Ben & Troy) to carry on the construction and, perhaps exhibit at the Transmediale since we seem to be welcome. For me it is a 100% go solution; if we find the partners and legal support (authorizations,
Rotterdam
We are now supported by the V2, if we work this solutionvery hard, there might be potential developments. Rotterdam has a huge industrial potential, Netherland is quite logic country to develop such a floating architecture...
Fresnay l'Eveque (near Chartres, one hour south to Paris)
My father's studio is there, we have a piece of land where we could have a 200m2 workshop attached to it. But why would we go there ? HAHAHAHA!
So, if we can't bring our spaceship in Linz on the river Danube, where can we land to make the first contact with humans ?
We need to warn the Austrians, the sea-level is rising, (Prophetic voice) in a long time, men will come from the sea, and they will have this strange boat, and they will have to authorize it on the Danube.
== The space ==



Below, I make a proposal for this space
us 
- Floorplan
- where we can strore the bits and pieces of the model that we'd be making- Suspension plans
- Electric plan
- Safety, fire in particular (for the paper-made objects)?
- Can we paint / drill in the collumn?
- we want the the graphic design requirements, the fonts, so we should put ah home, situation, scrutie
== The time of work and show ==
Now, we need to design an entire new proposal for the ARS electronica with the new location and new techniques.

That's a half piesimple structure made of thin wood, covered with plywood. The 1/3 top part is not covered so the structure is visible, to attache the nylon threads. The structure is super light weight and low cost, it is also visually quite spectacular.
The ARS organisers suggested that we use the plastic 3D printer to print the models :

It is absolutely wicked super beautiful, problem : it takes ages and it is super expensive and produced quite heavy objects.
On the other hand they also are able to laser cut card or plexiglass, very very quick, very cheap, very light :

So the laser cut card paper is what I want to go for.
With this technique we might even be able to make multiples, simplified Open_Sailing paper model that we could give away to visitors to fold and glue at home !
A video of the steps :
A draft of construction steps :





The blue panels are flat screens TVs.
== Making the exhibition ==
Two priorities :
- exhibition : Model , prints, presentation (film, Power poijnt)
- the real boat and other modules ( construction, alternative exibition space, navigation athorizations)
Deliverables at the exhibition :
- Model at 1/50 en paper alser cutting suspended
- The wooden set in which the whole floating structure is suspended, half pipe (see drawings).
- Video documentation on the screens.
- printed leaflets.
- One big print to put up the wall, on the column, in front of the model.
== Dates ==
I need 3 weeks, perhaps 2 weeks and a half before the installation to build, using the laser cutting machine quite a lot.
I need 1 day to build the supporting wooden structure, the half pipe, with the help pf someboday.
2-3 days installation before the show
4 september 2009, 16h30 - 17h30 Presentation the Open_Sailing in "PIZELSPACE", 30 Minutes panel, 30 minutes presenting the model
4 september 2009, 18h30 Ars Electronica Gala
9 september2009, evening, closing ceremony of the ARS electronica
== Money Problem ==
Now I have to make an entire new exhibition proposal and all our plans have changes.
Instead of spending my time producing the boat, I am forced to prepare another set for the exhibition, so I am not producing research, I m making a presentation model like I did 6 months ago. It is good for the project publicity of course, so let's do it.
In the end we are not going to show the real boat in Linz, all our partners are disapointed and trust us less now.
Without the ARS production money, we cant move on, we need money to buy materials and cover our expenses. So we need to either find more money, or convince the ARS electronica to financially support our research on site.I have personnaly invested £ 18'000, of which £ 8000 I borrowed. the production budget was supposed to correct this negative balance in my investment, in other word I am financially on trouble, and if we don't get ARS financial support in the end I don't know how I will be able to carry on the research.
What I say is that we should use a part of the production money for the production of the real object, it is totally unfair, I have to make a model just for ARS taking my time from making the real one at my own expenses.
Now Cesar has to :
- propose a new design for the exhibition (done, below, more precisions when I have the technical drawing of the space by Dani)
- get permission for the new design
- obtain all technical datas (dimensions, suspension allowance, electric access, fire safety etc.
- contact the carpenters of the festival, ask their price, where they buy the wood from.
- contact the lighting guy
- Making sure we got 2 massive screens attached to the columns.
- contact the laser cutting FABLAB
- get permission to work with the laser, perhaps out of museum opening hours, be ready to pay Clemens for the couple of hours he'll be helping teaching Cesar at the beginning how to use the machine
- ask for the Apollo Lounge to remain during our exhibition so we are between the space exploration and geocities, the strategic future of the world
- receive confirmationt from :
- Martin, Horst, Gerfried for the design
- carpenters for availability for construction, a little storage space for the parts of the model while under construction
- light guys of the type of light they want to use
Daniela :
- calculate how much production money remains
- send the space technical drawings, electric implantation, fire safety regulations.
- facilitate Cesar's work with ARS staff : carpenters, electric, light, fire safety, using 2 screens.
Martin, Horst :
- just tell me if you like the design I propose, I will send more detail when I have more details from Dani ie : time of fabrication, who's doing it.
- allow me to work with the laser cutting machine at FABLAB, without disturbing working hours of ARS staff. I talked to Clemens, he's happy to help, we have to add his work to the production bill as well. The cost of card laser cutting is a tiny fraction of the cost of plastic printing, and I prefer the feel of it.
- the usage of a small store space, to accumulate the many tiny piece of model I will be making during 2-3 weeks.
Thank you very much for reading such a long post. Any question cesar.harada@international-ocean-station.org | 00 +44 7 853 286 216
Over the last 15 days, tensions and misunderstandings kept on increasing in the organisation of what would happen at the ARS Electronica festival. This is why I went to ARS to sort this, and I think it has been a succesful journey. Yesterday we found an agreement that would make everyone happy I hope :
- making a good show.
- making the continuation of the research possible.
What's is:
- written like this is from them, the ARS Electronica organization.- The rest is me, Cesar.
== They like the Open_sailing project a lot ==
They insist they like the Open_Sailing a lot, and they put a lot of effort in making it happen.
They will make sure we meet interesting people and they ask us to focus on the quality of the presentation. So, they want to make clear it is more a presentation of a project than a project itself...
== The contract ==
The contract has been signed by both ARS directors and us. Which means, now we are legally bound, finally. Another piece of the contract is missing, the one in which we agree of the detail of what's being made, the final design being the decision of ARS. I guess this more technical piece of contract will be signed once we agree on the final design, I propose one at the bottom of this message.
== The money ==
The total [Next IDEA] allocated budget of €15000 is divided in 2 parts :
a. € 7500 life : transport, hotel, food for us when we come to the festival to produce the work, and we can use this budget the way we like, it is ours.
b. € 7500 production : that means the fabrication of our exhibited artwork, materials, labour, including the ARS staff labour (32.5€/ hour/ staff), this money remains under the control of ARS, in other words, if we want to pay something for production, we must ask ARS, and ARS pays for it, indirectly...
Yesterday, thursday 23 July 2009, the first instalment (a. budget) of €4000 transfert was sent, should be reachable next tuesday. The next and final a. instalment of €3500 will be paid after the exhibition.
== Boat and Permission on the Danube ==
We won the [NEXT IDEA] grant with this proposal :
You can download the pdf of our application here.
Unfortunately ARS couldn't get the permssion for us to put in the water, moor, and navigate, even with our detailled specifications and intentions. The Danube is very regulated river, fast and strong, with a lot of traffic, and regulations and norms. ARS also refuses to show the Open_Sailing on land. In other words, there is no way we can bring and present the Open_Sailing real vessel, the container will not come to Linz, we wont depart on the Danube the 9th of september for a wonderful adventure to the Black Sea...
I was very sad and disapointed when I understood this. Since we won the grant with the above proposal, since more than 2 monhts all our efforts has been directed to make this picture a reality, so much money was spend, many of us travelled from another country to come to work in London in difficult conditions, some of us even quit their well-paid full-time job, I personnaly invested all my life savings and even borrowed money from my family I must return urgently, Ben and Troyo did the same cominbg from Berlin, Nasser litteraly abandonned his life in Paris, house, family, work, savings, just to give a few examples...
== Alternatives ==
This does not mean the project is over. NO WAY ! The project is about the research, not about the show, so let's carry on !
I personally never to exhibit for the sake of it, I want to exhibit to show new researches, I dont want to exhibit twice the same thing, I want to explore, not parade.
Of course, on the other hand we need to give the project notoriety to gain credibility to attract investment to carry on the research.
What do we have now ?
- a team of super motivated people, who have skills and curiosity to carry our new experiments
- we have designed and build the boat beyond 50%
- we have some budget
- we have plenty of things we want to test, and perhaps much more time since the
So, what shall we do now ?
- prepare a good show in Linz to attract a more international support, for a long term development.
- continue the research. Now some researches like the nomadic ecosystem needs "growing" on the water to be usefull.
Where shall we carry on the construction?
London
We can carry on building in Area 10 for a few more days, but now they are waiting for us to get out, our vessel is too fragile to go on North sea storm, but good enough for a small closed sea, a lake, easily. So let's take it to where we can show it, and in London, short term we don't have a date yet.
Berlin
We could work at the Atelier KW (at Ben & Troy) to carry on the construction and, perhaps exhibit at the Transmediale since we seem to be welcome. For me it is a 100% go solution; if we find the partners and legal support (authorizations,
Rotterdam
We are now supported by the V2, if we work this solutionvery hard, there might be potential developments. Rotterdam has a huge industrial potential, Netherland is quite logic country to develop such a floating architecture...
Fresnay l'Eveque (near Chartres, one hour south to Paris)
My father's studio is there, we have a piece of land where we could have a 200m2 workshop attached to it. But why would we go there ? HAHAHAHA!
So, if we can't bring our spaceship in Linz on the river Danube, where can we land to make the first contact with humans ?
We need to warn the Austrians, the sea-level is rising, (Prophetic voice) in a long time, men will come from the sea, and they will have this strange boat, and they will have to authorize it on the Danube.
== The space ==
The exhibition will happen inside the Ars Electronica Center in front of the Geocity Entrance (which has an interestingly similar set of interests)!It is a nice space, between Geocity (the state of the earth) and the Apollo Lounge explaining when we'll get the moon station.
Below, I make a proposal for this space
Opening is 3rd September, closing is 8th of September. (We did not directly talk about that but of course it is preferable that you or some people from your team are staying at the exhibition most of the time in order to talk to the visitors and to explain the project).What we need to know from ARS :
- Floorplan
- where we can strore the bits and pieces of the model that we'd be making- Suspension plans
- Electric plan
- Safety, fire in particular (for the paper-made objects)?
- Can we paint / drill in the collumn?
- we want the the graphic design requirements, the fonts, so we should put ah home, situation, scrutie
== The time of work and show ==
The exhibition has to be finished before the opening of the Festival, thus: on 2nd September. The Ars Electronica staff helps you to create the exhibition (carpenter, technicians and so on).== Our proposal ==
Now, we need to design an entire new proposal for the ARS electronica with the new location and new techniques.
-All steps that are done by you regarding to create the exhibition have to be transparent and agreed with us.I thought about this :
-You send us a concept of the exhibition. This should include: a design sketch with the components located in the area, a technical sketch with a list of materials and hardware you need, etc.
Together, we will agree on how we will create the exhibition based on your concept.
That's a half piesimple structure made of thin wood, covered with plywood. The 1/3 top part is not covered so the structure is visible, to attache the nylon threads. The structure is super light weight and low cost, it is also visually quite spectacular.
The ARS organisers suggested that we use the plastic 3D printer to print the models :
It is absolutely wicked super beautiful, problem : it takes ages and it is super expensive and produced quite heavy objects.
On the other hand they also are able to laser cut card or plexiglass, very very quick, very cheap, very light :
So the laser cut card paper is what I want to go for.
With this technique we might even be able to make multiples, simplified Open_Sailing paper model that we could give away to visitors to fold and glue at home !
A video of the steps :
A draft of construction steps :
The blue panels are flat screens TVs.
== Making the exhibition ==
Two priorities :
- exhibition : Model , prints, presentation (film, Power poijnt)
- the real boat and other modules ( construction, alternative exibition space, navigation athorizations)
Deliverables at the exhibition :
- Model at 1/50 en paper alser cutting suspended
- The wooden set in which the whole floating structure is suspended, half pipe (see drawings).
- Video documentation on the screens.
- printed leaflets.
- One big print to put up the wall, on the column, in front of the model.
== Dates ==
I need 3 weeks, perhaps 2 weeks and a half before the installation to build, using the laser cutting machine quite a lot.
I need 1 day to build the supporting wooden structure, the half pipe, with the help pf someboday.
2-3 days installation before the show
4 september 2009, 16h30 - 17h30 Presentation the Open_Sailing in "PIZELSPACE", 30 Minutes panel, 30 minutes presenting the model
4 september 2009, 18h30 Ars Electronica Gala
9 september2009, evening, closing ceremony of the ARS electronica
== Money Problem ==
Now I have to make an entire new exhibition proposal and all our plans have changes.
Instead of spending my time producing the boat, I am forced to prepare another set for the exhibition, so I am not producing research, I m making a presentation model like I did 6 months ago. It is good for the project publicity of course, so let's do it.
In the end we are not going to show the real boat in Linz, all our partners are disapointed and trust us less now.
Without the ARS production money, we cant move on, we need money to buy materials and cover our expenses. So we need to either find more money, or convince the ARS electronica to financially support our research on site.I have personnaly invested £ 18'000, of which £ 8000 I borrowed. the production budget was supposed to correct this negative balance in my investment, in other word I am financially on trouble, and if we don't get ARS financial support in the end I don't know how I will be able to carry on the research.
- The rules of [the next idea] grant does not allow us to pay production budget to you. Anyway – if there should be budget left after the Festival, Martin will try to find a possibility in discussion with Gerfried in order to cover a part of your taken investments with the left amount.- Martin has promised to do everything he can so we can have the remaining production money. Thank you very much.
What I say is that we should use a part of the production money for the production of the real object, it is totally unfair, I have to make a model just for ARS taking my time from making the real one at my own expenses.
- I will send you an overview of already consumed production budget and an estimation of future costs (including a 3D print and – optional – further presentation material) in the beginning of next week.== Individual involvement ==
-We will agree than how we will use the remaining budget.
Now Cesar has to :
- propose a new design for the exhibition (done, below, more precisions when I have the technical drawing of the space by Dani)
- get permission for the new design
- obtain all technical datas (dimensions, suspension allowance, electric access, fire safety etc.
- contact the carpenters of the festival, ask their price, where they buy the wood from.
- contact the lighting guy
- Making sure we got 2 massive screens attached to the columns.
- contact the laser cutting FABLAB
- get permission to work with the laser, perhaps out of museum opening hours, be ready to pay Clemens for the couple of hours he'll be helping teaching Cesar at the beginning how to use the machine
- ask for the Apollo Lounge to remain during our exhibition so we are between the space exploration and geocities, the strategic future of the world
- receive confirmationt from :
- Martin, Horst, Gerfried for the design
- carpenters for availability for construction, a little storage space for the parts of the model while under construction
- light guys of the type of light they want to use
Daniela :
- calculate how much production money remains
- send the space technical drawings, electric implantation, fire safety regulations.
- facilitate Cesar's work with ARS staff : carpenters, electric, light, fire safety, using 2 screens.
Martin, Horst :
- just tell me if you like the design I propose, I will send more detail when I have more details from Dani ie : time of fabrication, who's doing it.
- allow me to work with the laser cutting machine at FABLAB, without disturbing working hours of ARS staff. I talked to Clemens, he's happy to help, we have to add his work to the production bill as well. The cost of card laser cutting is a tiny fraction of the cost of plastic printing, and I prefer the feel of it.
- the usage of a small store space, to accumulate the many tiny piece of model I will be making during 2-3 weeks.
Thank you very much for reading such a long post. Any question cesar.harada@international-ocean-station.org | 00 +44 7 853 286 216
Open_Sailing_01 @ RCA SHOW 2009
Ole !
It is indeed too late to advertise about it, but let's do it anyway : Open_Sailing was exhited at the Royal College of Art final show 2009, and it was a great success. We met so many interesting people! We got a nice website for our show.
The setup was simple, thanks to Ilona, Hiromi and Colet for your precious help.
And if you haven't seen it yet : the superb model made by Oliver Goodhall ! [How it was made]
The show was busy, it was so good !
Open_Sailing_01 was also selected to represent the college as one of the most promising sustainable project : Sustainable design at the Royal College of Art. Capture 1 | 2
All these great pictures taken by Hayeon Yoo, THANK YOU ! ( www.flickr.com/photos/hayeon/ )
Labels:
3d,
construction,
design,
farm,
media,
model,
presentation,
rca
Preparing the container
<Sylvain Troianowski>
It feels we're leaving London, getting ready to go to Linz, Austria where the assembly will happen, we cant wait !


3D file : http://www.international-ocean-station.org/download/20090711container/20090711container-usage.dwg
Made by Sylvain Troianowski> for Open_Sailing.
It feels we're leaving London, getting ready to go to Linz, Austria where the assembly will happen, we cant wait !
3D file : http://www.international-ocean-station.org/download/20090711container/20090711container-usage.dwg
Made by Sylvain Troianowski> for Open_Sailing.
Debriefing about the nomadic ecosystem
The nomadic ecosystem
What?
the project "opensailing" is divided between different labs.The Nomadic Ecosystem is a very important part of this adventure, because this is a major link between the scientific studies (international oceanic station) and the self-sufficiency of the team.
In this way, we imagined a biomass production module (BPM), independent from the main platform, but directly in relation to it, following the concept of instinctive architecture.





Why?
There are three major interests in the development of this part of the project
1-Culture of phytoplankton

the BPM is a conductive environment for recuperation of phytoplankton with a view to analyze :
- CO2 capture (CO2 sinks)
- energy production (biofuel)
the advantage of a nomadic structure is that it will be possible to compare different species of plankton, and to optimize the result of it.
Finally a real library of phytoplankton will be created and will be a strong base for biologic and ecologic researches.
2-Creation of an ecosystem
Creation of an ecosystem is a very great idea, but objectively, it is a really difficult task. Everybody will agree, reproducing the amazing work of nature is almost impossible when the limit of this experience is time.
however phytoplankton is the basis of the whole aquatic ecosystem, it is bait for other animals, and the design and the configuration of this module will create a refuge for living species.
this space will be, in the short term, an ecosystem model.
3-Food production
This tiny ecosystem will be a wonderful area for fishing for aquatic animals, and little fish, and these ones will be bait for the bigger fish that constitute an important input of animal proteins in the team's nutrition.
in parallel, on the opensailing platform, a basic laboratory must be developed for :
-producing an intensive culture of stump
-controlling these stumps separately (library)
-testing a bioreactor for energy and CO2 capture
references :
books
Aquaculture, references(editions synthese agricole)
Chimie de l eau de mer, Gerard Copin-Montegut (institut oceanographique)
web
http://www.oceano.org/io/spip.php?rubrique3
What?
the project "opensailing" is divided between different labs.The Nomadic Ecosystem is a very important part of this adventure, because this is a major link between the scientific studies (international oceanic station) and the self-sufficiency of the team.
In this way, we imagined a biomass production module (BPM), independent from the main platform, but directly in relation to it, following the concept of instinctive architecture.



Why?
There are three major interests in the development of this part of the project
1-Culture of phytoplankton

the BPM is a conductive environment for recuperation of phytoplankton with a view to analyze :
- CO2 capture (CO2 sinks)
- energy production (biofuel)
the advantage of a nomadic structure is that it will be possible to compare different species of plankton, and to optimize the result of it.
Finally a real library of phytoplankton will be created and will be a strong base for biologic and ecologic researches.
2-Creation of an ecosystem
Creation of an ecosystem is a very great idea, but objectively, it is a really difficult task. Everybody will agree, reproducing the amazing work of nature is almost impossible when the limit of this experience is time.
however phytoplankton is the basis of the whole aquatic ecosystem, it is bait for other animals, and the design and the configuration of this module will create a refuge for living species.
this space will be, in the short term, an ecosystem model.
3-Food production
This tiny ecosystem will be a wonderful area for fishing for aquatic animals, and little fish, and these ones will be bait for the bigger fish that constitute an important input of animal proteins in the team's nutrition.
in parallel, on the opensailing platform, a basic laboratory must be developed for :
-producing an intensive culture of stump
-controlling these stumps separately (library)
-testing a bioreactor for energy and CO2 capture
references :
books
Aquaculture, references(editions synthese agricole)
Chimie de l eau de mer, Gerard Copin-Montegut (institut oceanographique)
web
http://www.oceano.org/io/spip.php?rubrique3
Labels:
3d,
construction,
design,
graphic,
structure
Modelmaking
The amazing Oliver Goodhall (RCA page + We made that page) is making the model for the RCA show. Work in progress WATCH OUT ! WET PAINT !
1. proposing an aesthetic :

2. making a quick pre-model :

3. cutting the real bridge :

4. choosing the colors :

5. making the small moving parts (here the rudder):

6. the hulls :

7. all the hulls :

8. a section of the ballast bag :

9. ballast bag, flat :

10. Assembling the hull :


11. now wondering : shall we put this on a stand to keep it suspended and open? I would say yes, if you can fold it for transport! Amazing Oliver Goodhall !
The model will soon be on a shelf and in a suitecase! GRRREAT!
1. proposing an aesthetic :
2. making a quick pre-model :
3. cutting the real bridge :
4. choosing the colors :
5. making the small moving parts (here the rudder):
6. the hulls :
7. all the hulls :
8. a section of the ballast bag :
9. ballast bag, flat :
10. Assembling the hull :
11. now wondering : shall we put this on a stand to keep it suspended and open? I would say yes, if you can fold it for transport! Amazing Oliver Goodhall !
The model will soon be on a shelf and in a suitecase! GRRREAT!
Labels:
construction,
craft,
design,
presentation,
technique
Construction in progress, need help.
We are now in the middle of the construction. We need help. Gumtree ad.
If you fancy gettig your hands dirty, just pop in! We are working in south London, behind Peckham Librairy, come.

Nasser Moustakim, welding his life away

Ian Daniell cutting, Andrew Friend adjusting and fixing the wood on the structure.
And because people are often asking : the Open_Sailing_1 is 9.6 m Diameter, 4.5 meter high, 4 tons. Hiromi has calculated we have 90cm in the water with 4tons.

Overview of the construction, in the same room on the right, the Happy tree friends.
Now we are in a ruch, public presentation saturday, AAAAAAHHHHH
If you fancy gettig your hands dirty, just pop in! We are working in south London, behind Peckham Librairy, come.
Nasser Moustakim, welding his life away
Ian Daniell cutting, Andrew Friend adjusting and fixing the wood on the structure.
And because people are often asking : the Open_Sailing_1 is 9.6 m Diameter, 4.5 meter high, 4 tons. Hiromi has calculated we have 90cm in the water with 4tons.
Overview of the construction, in the same room on the right, the Happy tree friends.
Now we are in a ruch, public presentation saturday, AAAAAAHHHHH
Labels:
construction,
design,
london,
open-source
Construction update
Yes, the construction is going well.
If you haven't yest, you want to check our webcam here :

The thing is that we dont necessarily work right under it, actually most of the time we are working in a different building, but check it out, see the time moving - it is live !!!!
There is a lot of welding action (Nasser Moustakim)

Cutting action (Adrien Lécuru)

And Cooking (Cesar - doing the runner + secretary)

In a week time we have a show, ooohh, that's very soon !!!! RUSH !!!!!!!

So that's the site inside, where most welding work is carried on.

And this is the construction outside, where most cutting happens.
It is a very enjoyable work. It is quite tough. Now Adrien and Nasser are heavily involved, I (cesar) wish I didnt have to do all the admin and spend my day either on the computer or driving the van to collect and deliver raw materials or tools. I reclaim more time for design! After graduation... Sleep after graduation ...
If you haven't yest, you want to check our webcam here :
The thing is that we dont necessarily work right under it, actually most of the time we are working in a different building, but check it out, see the time moving - it is live !!!!
There is a lot of welding action (Nasser Moustakim)
Cutting action (Adrien Lécuru)
And Cooking (Cesar - doing the runner + secretary)
In a week time we have a show, ooohh, that's very soon !!!! RUSH !!!!!!!
So that's the site inside, where most welding work is carried on.
And this is the construction outside, where most cutting happens.
It is a very enjoyable work. It is quite tough. Now Adrien and Nasser are heavily involved, I (cesar) wish I didnt have to do all the admin and spend my day either on the computer or driving the van to collect and deliver raw materials or tools. I reclaim more time for design! After graduation... Sleep after graduation ...
Labels:
architecture,
construction,
london,
open-source,
presentation,
structure
Subscribe to:
Posts (Atom)
Labels
design
(116)
structure
(81)
architecture
(69)
Energy_Animal
(53)
Nomadic_Ecosystem
(46)
art
(43)
Instinctive_Architecture
(42)
free energy
(36)
3d
(34)
graphic
(33)
Swarm_Operating_System
(32)
Ocean
(31)
presentation
(31)
maps
(28)
Ocean_Cookbook
(23)
biology
(23)
communication
(23)
navigation
(21)
Open_Politics
(20)
strategy
(20)
water
(20)
boat
(19)
computing
(19)
survival
(19)
Life_Cable
(18)
construction
(18)
farm
(18)
safety
(17)
algae
(16)
posting
(16)
materials
(15)
wave
(15)
ecology
(14)
politics
(14)
technology
(14)
london
(13)
physics
(13)
agriculture
(12)
battery
(12)
Openet
(11)
food
(11)
animal
(10)
craft
(10)
culture
(10)
fishes
(10)
mechanics
(10)
Open_Sailing
(9)
chemistry
(9)
media
(9)
open-source
(9)
plastic
(9)
theory
(9)
video
(9)
TED
(8)
behaviour
(8)
competition
(8)
engine
(8)
exploration
(8)
performance
(8)
technique
(8)
philosophy
(7)
sociology
(7)
Open_Games
(6)
biomass
(6)
inflatable
(6)
seasteading
(6)
wind
(6)
OS_Polar
(5)
USA
(5)
animation
(5)
electronics
(5)
legal
(5)
medecine
(5)
pollution
(5)
berlin
(4)
data
(4)
ethics
(4)
money
(4)
psychology
(4)
reportage
(4)
service
(4)
statistics
(4)
sun
(4)
Brazil
(3)
Cesar Harada
(3)
Observation
(3)
Protei
(3)
TEDxOilSpill
(3)
catastrophy
(3)
engineering
(3)
garbage
(3)
google
(3)
history
(3)
identity
(3)
kite
(3)
mapping
(3)
metareciclagem
(3)
oil spill
(3)
recovery
(3)
research
(3)
sailing
(3)
science
(3)
space
(3)
spain
(3)
sustainable
(3)
tradition
(3)
AI
(2)
Argo
(2)
CAD
(2)
Environment
(2)
Exploration. Robots Swarm .Sea
(2)
Jellyfish
(2)
LABB
(2)
Louisiana
(2)
NL
(2)
NOLA
(2)
Object Oriented Politics
(2)
Open Hardware
(2)
Pachube
(2)
Pacific
(2)
Plastiki
(2)
TEDxBoston
(2)
UK
(2)
World Environment Organization
(2)
ants
(2)
austria
(2)
autonomy
(2)
com
(2)
coral
(2)
des
(2)
endangered species
(2)
fiction
(2)
geography
(2)
gulf of mexico
(2)
model
(2)
news
(2)
open architecture initiative
(2)
open innovation
(2)
organisation
(2)
plant
(2)
post
(2)
preservation
(2)
product
(2)
protection
(2)
rca
(2)
reserve
(2)
robots
(2)
simulation
(2)
skeleton
(2)
social
(2)
symbol
(2)
text
(2)
treatment
(2)
waste
(2)
Adhocracy
(1)
Aerial
(1)
Articles
(1)
BBC
(1)
BLDGBLOG
(1)
BP
(1)
BP oil spill
(1)
Balloon
(1)
Bangladesh
(1)
Barataria
(1)
Barcelona
(1)
Bay
(1)
Black
(1)
Boston
(1)
CCCB
(1)
Colet Castano
(1)
Crafts
(1)
Decentralize
(1)
Distributed System
(1)
Documentary
(1)
Dream
(1)
Environmental Concerns
(1)
Europe
(1)
Flight
(1)
Germany
(1)
Grassrootsmapping
(1)
Grenelle
(1)
Grier
(1)
Helium
(1)
Hydrogenase. Architecture
(1)
Institute
(1)
JP
(1)
Jimmy
(1)
John
(1)
Kaku
(1)
Kiel
(1)
Kim
(1)
Korea
(1)
LA Bucket Brigade
(1)
Luxembourg
(1)
NOAA
(1)
New Orleans
(1)
New York
(1)
Nina
(1)
Noah
(1)
Norway
(1)
Oceanography
(1)
Oil
(1)
Photography
(1)
Plane
(1)
Plater
(1)
Pope
(1)
Pragmatism
(1)
Resistance
(1)
Robot
(1)
Rotterdam
(1)
Ruairi Glynn
(1)
Sketchup
(1)
Snyder
(1)
Sphere
(1)
Spill
(1)
Stitching
(1)
TEDxMidAtlantic
(1)
Talk
(1)
Tilling
(1)
Tribe
(1)
Trondheim
(1)
Tumas
(1)
Uros
(1)
V2_
(1)
Vision
(1)
Washington DC
(1)
Werner
(1)
Wood
(1)
Woods Hole
(1)
YouTube
(1)
Zygmunt
(1)
accident
(1)
admin
(1)
alternative
(1)
anaconda
(1)
appropedia
(1)
aquanaut
(1)
architecture for humanity
(1)
ars
(1)
autarcy
(1)
autark
(1)
awareness
(1)
ball
(1)
baltic
(1)
belgium
(1)
biodiversity
(1)
biofuel
(1)
brainstorming
(1)
broadcast
(1)
buoy
(1)
canada
(1)
carbon
(1)
cardboard
(1)
carton
(1)
cesar
(1)
clear climate code
(1)
climate
(1)
cold fusion
(1)
collaboration
(1)
concepts
(1)
cruise
(1)
current
(1)
deadly
(1)
deep
(1)
departure
(1)
developing
(1)
disposal
(1)
dispute
(1)
diving
(1)
diy
(1)
drone
(1)
eartquake
(1)
edgcm
(1)
events
(1)
excellent
(1)
experimental
(1)
exploring
(1)
farming
(1)
farms
(1)
file
(1)
fire
(1)
flickr
(1)
floating
(1)
florida
(1)
fluid dynamics
(1)
forum
(1)
france
(1)
future
(1)
futurology
(1)
generator
(1)
geodesic
(1)
geoengineering
(1)
graduate
(1)
green
(1)
grey
(1)
habitation
(1)
halley vi research station
(1)
harada
(1)
hybrid
(1)
icon
(1)
ideas
(1)
ideology
(1)
independent
(1)
indian
(1)
indonesia
(1)
industrial
(1)
inhabitat
(1)
innovation
(1)
instructables
(1)
insurance
(1)
japan
(1)
kelp
(1)
ledger
(1)
lloyds
(1)
louisina
(1)
machine
(1)
magnet
(1)
maths
(1)
message
(1)
messaging
(1)
metal
(1)
mimicry
(1)
mission blue
(1)
mobile
(1)
modular
(1)
monitoring
(1)
nasa
(1)
natural
(1)
naviagation
(1)
nice
(1)
nucelar
(1)
open source
(1)
opportunity
(1)
pachbox
(1)
park
(1)
participation
(1)
patch
(1)
pelamis
(1)
people
(1)
photo
(1)
pirate radio
(1)
planning
(1)
pods
(1)
polar
(1)
pop
(1)
popular
(1)
power
(1)
pr
(1)
press
(1)
raft
(1)
reef
(1)
render
(1)
renewable
(1)
repost
(1)
rogue
(1)
sewage
(1)
ship
(1)
ships
(1)
shit
(1)
software
(1)
sound
(1)
speculation
(1)
studies
(1)
study
(1)
super-collider
(1)
sylvia earle
(1)
system
(1)
temporary
(1)
toxic
(1)
tv
(1)
typography
(1)
underwater
(1)
utopia
(1)
weather
(1)
web
(1)
whales
(1)
wired
(1)
workshops
(1)
young
(1)
youth
(1)